Laserfiche WebLink
RECEIVED <br /> Attachments AUG 0 4 2014 <br /> BRAIVO JUNCT"FIELD OFFICE <br /> Attachment A �& <br /> As-Built Drawings SAFETY <br /> Mountain Man-John Mower <br /> Attachment B <br /> As-Built Technical Summary <br /> DSM—David McLay-Colorado Professional Engineer License# <br /> Attachment C <br /> Representative Project Construction Photographs <br /> Attachment D <br /> Supplemental Geotechnical Investigation-J. Erich Rauber <br /> May 12th, 2014 <br /> R Squared, Inc. May 12, 2014 Supplemental Geotechnical Investigation, -Rule 6.5 <br /> Geotechnical Stability Report New Access Road, prepared by David McLay and Erich Rauber <br /> Attachment E <br /> Project Directives <br /> DSM—David McLay-Colorado Professional Engineer License# <br /> Memo from David McLay-May 30, 2014-Change Directive Retaining Wall <br /> Memo from Erich Rauber-June 1, 2014-MSE Wall Design Revision <br /> Memo from David McLay-June 2, 2014-Road Surface Material Change Request and Retaining <br /> Wall Design Revisions. <br /> Memo from David McLay-June 3, 2014-Description of Change <br /> Memo from David McLay-June 4, 2014-Changes to the access road to date <br /> Memo: from David McLay—June 8, 2014, Additional MSE Wall Block Ordered June 7, 2014 <br /> Attachment F <br /> Weekly Summary Reports-Wildcat Mine Access Road <br /> Opal Group, Inc. <br /> April 28th to May 11th <br /> May 12th to May 18th <br /> May 19th to May 25th <br /> May 26th to June 1st <br /> June 1st to June 8th <br /> Wildcat Mining Corporation-May Day Idaho Mine Complex <br /> 3926 North State Highway 67 <br /> Sedalia,Colorado 80135 <br />