My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-04_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2014-08-04_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:05:42 PM
Creation date
8/13/2014 9:31:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Revision
Doc Date
8/4/2014
Doc Name
TR2 As Builts- Part 1
From
WMC
To
DRMS
Type & Sequence
TR2
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fairview Land Corporation, May 7, 2012—Letter-Fairview's Land Corp.'s desires to retain the <br /> New Access Road at the May Day Idaho Mine Complex after mining is completed. <br /> Memo from David McLay-May 30, 2014-Change Directive Retaining Wall <br /> Memo from Erich Rauber-June 1-MSE Wall Design Revision <br /> Memo from David McLay-June 2-Road Surface Material Change Request and Retaining Wall <br /> Design Revision <br /> Memo from David McLay-June 3, 2014-Description of Change <br /> Memo from David McLay-June 4, 2014-Changes to the access road to date <br /> Memo:from David McLay June 8, 2014, Additional MSE Wall Block Ordered June 7, 2014 <br /> Mountain Man,July 2014 "As-Built"Survey Maps <br /> R Squared, Inc. May 2, 2010, Geotechnical Reconnaissance, Idaho Mine Access Road, May Day <br /> Idaho Mine Complex <br /> R Squared, Inc. May 12, 2014 Supplemental Geotechnical Investigation, -Rule 6.5 Geotechnical <br /> Stability Report New Access Road, prepared by David McLay and Erich Rauber <br /> Weekly Summary Reports-Wildcat Mine Access Road prepared by Opal Group, Inc. <br /> April 28th to May 11th <br /> May 12th to May 18th <br /> May 19th to May 25th <br /> May 26th to June 1st <br /> June 1st to June 8th <br /> Wildcat Mining Corporation-May Day Idaho Mine Complex <br /> 3926 North State Highway 67 <br /> Sedalia,Colorado$0135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.