Laserfiche WebLink
Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Topsoil Replacement at 6 inch depth over 36 Acres <br /> Site: Cedar Point Permit Action: 2014 Inspection Permit/Job#: M1994108 <br /> PROJECT IDENTIFICATION <br /> Task#: 004 State: Colorado Abbreviation: None <br /> Date: 7/22/20I4 County: Montezuma Filename: M108-004 <br /> User: KAP <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/ ush- ull <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D8T-8SU <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: I NA <br /> Cost Breakdown: Scraper Work Team Support E ui went Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 100 100 NA NA <br /> Ownership cost/hour: $110.90 NA $62.67 $62.67 NA NA <br /> Operating cost/hour: $243.12 NA $10822 $108.22 NA NA <br /> Ripper op.cost/hour: NA NA $0.00 $0.00 NA NA <br /> Operator cost/hour: $33.56 NA $38.01 $38.01 NA NA <br /> Unit Subtotals: $387.59 NA $208.90 $208.90 NA NA <br /> Number of Units: 2 0 1 1 0 0 <br /> Group Subtotals: Work: $775.18 Support: $417.80 Maint: $0.00 <br /> Total work team cost/hour:$1,192.98 <br /> MATERIAL QUANTITIES <br /> Initial volume: 29,040 CCY Swell factor: 1.125 <br /> Loose volume: 32,670 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,550 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Earth-Dry packed Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 _ LCY <br /> Payload Capacity: 32.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />