Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#003 Page 2 of 2 <br /> Visibility: 1.000 AVG. <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (SSD-AC) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.902 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4043 <br /> Adjusted unit production: 566.02 LCY/hr <br /> Adjusted fleet production: 1132.04 LCY/hr <br /> JOB TBM AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.394/LCY <br /> Total job time: 102.61 Hours <br /> Total job cost: $45,709 <br /> CIRCES Cost Estimating Software <br />