My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-25_REVISION - M1994108
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994108
>
2014-06-25_REVISION - M1994108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:14 PM
Creation date
8/12/2014 11:59:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994108
IBM Index Class Name
Revision
Doc Date
6/25/2014
Doc Name
Late FW Increase
From
DRMS
To
Noland, Inc.
Type & Sequence
AM1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT <br /> sheet 2 of 2Y <br /> Machine Total Fleet Size Haul Trip Return Trip <br /> Description [Cost/hourlunit (No.units) Cost/hr eet Cost/hri feet <br /> Subtotals: $0.00 $0.00 <br /> EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region: Cortez <br /> Transportation Cycle Time: Non- Total one-way travel distance: 18 0 miles <br /> Roadable Roadable Average travel speed: 40.0 mph <br /> Equipment Equipment <br /> Haul time(hours)= 0.45 0.45 Total non-roadable mob/demob cost': $5,381.82 <br /> Return time(hours)= 0.45 0.45 .two round trips with haul rig <br /> Loading time(hours)= 1.00 NA Total roadable mobldemob cost": $0.00 <br /> Unloading time(hours)= 1,00 NA ••one round trip,no haul rig <br /> Subtotals= 2.90 0.90 <br /> JOB TIME AND COST Total job time: 5.80. hours <br /> Total job cost: $�,�y <br />
The URL can be used to link to this page
Your browser does not support the video tag.