Laserfiche WebLink
EQUIPMENT <br /> sheet 2 of 2Y <br /> Machine Total Fleet Size Haul Trip Return Trip <br /> Description [Cost/hourlunit (No.units) Cost/hr eet Cost/hri feet <br /> Subtotals: $0.00 $0.00 <br /> EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region: Cortez <br /> Transportation Cycle Time: Non- Total one-way travel distance: 18 0 miles <br /> Roadable Roadable Average travel speed: 40.0 mph <br /> Equipment Equipment <br /> Haul time(hours)= 0.45 0.45 Total non-roadable mob/demob cost': $5,381.82 <br /> Return time(hours)= 0.45 0.45 .two round trips with haul rig <br /> Loading time(hours)= 1.00 NA Total roadable mobldemob cost": $0.00 <br /> Unloading time(hours)= 1,00 NA ••one round trip,no haul rig <br /> Subtotals= 2.90 0.90 <br /> JOB TIME AND COST Total job time: 5.80. hours <br /> Total job cost: $�,�y <br />