CIRCES Cost Estimating Software <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> PROJECT IDENTIFICATION sheet 1 of 2 <br /> Agency or organization name:Colorado Division Of Reclamation Mining And Safety <br /> Task#: 007 State:Colorado Permit/job#:M-1994-108 <br /> Date: 09/22/2010 County:Montezuma Abbreviation:none <br /> User: KAP Site:Cedar Point Filename:Mi08-007 <br /> Permit or other job action:Amendment <br /> Task description.Mobilize/Demobilize <br /> EQUIPMENT TRANSPORT RIG COST Shift basis: i per day <br /> Cost data source: CRG Data <br /> Truck tractor description:Generic on-highway truck tractor,6x4,diesel powered,400 HP(2nd half,2006) <br /> Truck trailer description:Generic folding gooseneck,drop deck equipment trailer(25T,50T,and 100'I) <br /> Available rig capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Cost Breakdown: Ownership cost/hour $16.63 $18.37 $22.33 <br /> Operating cost/hour, $44.38 $48.13 $50.07 <br /> Operator cost/hour $27.66 $27.66 $27.66 <br /> Helper cost/hour $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour $88.67 $117.55 $125.45 <br /> NON-ROApASLE EQUIPMENT <br /> Machine Weightlunit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br /> Description (Tons) Cost/hr/unit Cost/hr/unit (No.units) Cost/hr/fleet Costihrffleet Cost/fleet <br /> -Cat D8R Series/I-8U(200 53.17 $46.56 $125.45 2 $344.02 $250.90 $0.00 <br /> -Cat 633E Series 2(2001) 56.34 $80.67 $125.45 2 $412.23 $250.90 $0.00 <br /> -Revegetation Equipment 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br /> -Reveg failure 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br /> Subtotals. $973.59 $679.14 $0.00 <br />