Laserfiche WebLink
ameel-V <br /> 1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; underground working remediation and confirmatory drilling; secondary underdrain <br /> installation; nuclear moisture and density testing; geomembrane deployment, testing and repair <br /> monitoring and certification; subgrade and SLF inspection and certification, drainage ditch grading <br /> and concrete placement at the State Highway 67; SLF, DCF,UF, LVSCF, and concrete sampling. <br /> II) Laboratory Activities: Permeability and sieve analysis laboratory testing continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> > Drain Cover Fill sample numbers DCF-99 (control sample) <br /> Low Volume Solution Collection Fill samples, LVSCF 4-R, 5-R, 6-R and 7--R (record samples) <br /> Underdrain Fill sample number OF 11-R (record sample) <br /> Soil Liner Fill sample number SLF 17-R (record sample) <br /> Concrete cylinders were cast for compressive strength testing from drainage ditch adjacent to <br /> Highway 67 and the MSE wall. <br /> General Project Items <br /> Meetings and Discussions: Weekly Contractor Meeting—July 23, 2014 (CC&V, AMEC, Ames); ECA <br /> daily safety meetings, and Ames daily safety meetings. <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting and scheduling are some of the tasks occurring between CC&V Projects, <br /> AMEC, and Ames <br /> Miscellaneous: <br /> Drain coverfill crusher processing continued <br /> Highway 67 drainage ditch construction <br /> Deliveries: ECA received 12 rolls of 80-mil DSMS geomembrane for Phase 1. <br /> Submitted by: Eric Lorenson Date: July 29, 2014 <br /> r <br /> Reviewed by: Date: July 29, 2014 <br /> Tim Burkhard <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Approved By: / Date: <br /> Approved By: Date: <br /> 2014.07.26-MLE2 WEEKLY FINAL Page 4 of 7 <br />