My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-07_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-08-07_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 1:59:56 PM
Creation date
8/8/2014 7:26:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/7/2014
Doc Name
Weekly CQA Report: Week ending 07/26/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameel-V <br /> 1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; underground working remediation and confirmatory drilling; secondary underdrain <br /> installation; nuclear moisture and density testing; geomembrane deployment, testing and repair <br /> monitoring and certification; subgrade and SLF inspection and certification, drainage ditch grading <br /> and concrete placement at the State Highway 67; SLF, DCF,UF, LVSCF, and concrete sampling. <br /> II) Laboratory Activities: Permeability and sieve analysis laboratory testing continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> > Drain Cover Fill sample numbers DCF-99 (control sample) <br /> Low Volume Solution Collection Fill samples, LVSCF 4-R, 5-R, 6-R and 7--R (record samples) <br /> Underdrain Fill sample number OF 11-R (record sample) <br /> Soil Liner Fill sample number SLF 17-R (record sample) <br /> Concrete cylinders were cast for compressive strength testing from drainage ditch adjacent to <br /> Highway 67 and the MSE wall. <br /> General Project Items <br /> Meetings and Discussions: Weekly Contractor Meeting—July 23, 2014 (CC&V, AMEC, Ames); ECA <br /> daily safety meetings, and Ames daily safety meetings. <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting and scheduling are some of the tasks occurring between CC&V Projects, <br /> AMEC, and Ames <br /> Miscellaneous: <br /> Drain coverfill crusher processing continued <br /> Highway 67 drainage ditch construction <br /> Deliveries: ECA received 12 rolls of 80-mil DSMS geomembrane for Phase 1. <br /> Submitted by: Eric Lorenson Date: July 29, 2014 <br /> r <br /> Reviewed by: Date: July 29, 2014 <br /> Tim Burkhard <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Approved By: / Date: <br /> Approved By: Date: <br /> 2014.07.26-MLE2 WEEKLY FINAL Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.