My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-07_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-08-07_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 1:59:56 PM
Creation date
8/8/2014 7:26:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/7/2014
Doc Name
Weekly CQA Report: Week ending 07/26/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec""' <br /> Tertiary Underdrain: Complete within the PSSA footprint. <br /> B) Underground Workings <br /> Confirmatory drilling continues at the Anaconda Mine Complex. Additional confirmatory drilling <br /> and remediation is required. <br /> Approximately 200 cubic yards of cemented rock fill was placed in underg ound working#6318. <br /> The working was then partially backfilled with structural fill per project technical specifications. <br /> Additional remediation is required. <br /> C) Geomembrane: <br /> PSSA <br /> Geomembrane installation continued within the PSSA and included: deployment, seaming, repair; <br /> and QAIQC activities. Geomembrane installation was performed on the PSSA floor. PSSA east <br /> slope, and PSSA west slope. Approximately 73,509 square feet of 100 m:I LLDPE geomembrane <br /> was deployed (panels S-220 throughS-239). Subgrade was inspected and approved by AMEC, <br /> Ames and ECA representatives prior to geomembrane deployment. Approximately 3,941 linear <br /> feet of seam was fusion welded during deployment using one or two fusion welding machines for <br /> each day of deployment. Destructive and non-destructive testing was completed per project <br /> technical specifications (Destructs 92 through 101). <br /> Secondary liner panels S-186 through S-192, S-205 through S-219, and 5-224 through S-233, <br /> (secondary 100mil LLDPE—204,213 ft2)were accepted and approved for low volume placement <br /> by AMEC, Ames, and ECA representatives during this reporting period. Additional repairs may <br /> be required prior to placement of low volume solution collection fill (ie. wrinkle removal, sub-liner <br /> rock repair). <br /> Anchor trench was excavated to approximately station A13+00 on the east side of the PSSA and <br /> to station 612+00 on the west. Anchor trench backfilling occurred immediately after liner <br /> deployment. <br /> D) Overliner: <br /> • PSSA <br /> Cat 740 trucks hauled low volume solution collection fill (LVSCF)to the PSSA. Haul roads for the <br /> trucks were maintained at least 4 feet above secondary geomembrane. <br /> Ames continued placing low volume solution collection fill (LVSCF) on approved secondary liner <br /> in minimum 3-foot lifts with Cat GPS D6 and D8 wide pad dozers between panels S12 to S171 <br /> S17 to S39, S45 to S59, S65 to S67, S88 to S89, S132 to S145, S152 to 5156, S-164 to S165. <br /> S191 to 193, S195, S220 to S229, and S205 to S219. <br /> See the attached LVSCF map for all placement locations. <br /> Low volume material was removed and 4-inch-perforated pipe was installed on the liner near <br /> panel S201 using a Cat 312E excavator and two laborers. <br /> II) Storm Water Management <br /> Best Management Practices(BMPs)are being performed. <br /> CQA ACTIVITIES: <br /> 20/4.07.26-MLE2 WEEKLY FINAL Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.