Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 55 of 155 <br />Average push distance <br />Unadjusted hourly <br />production: <br />200 feet <br />946.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: <br />5,400 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG. ) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4863 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />460.04 LCY/hr <br />1840.16 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.770/LCY <br />Total job time: 4.28 Hours <br />Total job cost: $6,065 <br />CIRCES Cost Estimating Software <br />