Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 54 of 155 <br />BULLDOZER WORK <br />Task description: Regrade Sewage Treatment Ponds 5 -PI, 5 -P2 and 5 -P3 <br />Site: Williams Fork Mines Permit Action: Permit Renewal 06 Permit /Job #: C1981044 <br />PROJECT IDENTIFICATION <br />Task #: 032 State: Colorado <br />Date: 6/27/2014 County: Moffat <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EOt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />JIPMENT COST <br />Cat D10T - lOSU <br />574 <br />Semi - Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C044 -032 <br />Total unit Cost/Hour: $354.30 <br />Total Fleet Cost/Hour: $1,417.19 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$131.81 <br />NA <br />Operating Cost/Hour: <br />$184.48 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $354.30 <br />Total Fleet Cost/Hour: $1,417.19 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />7,000 <br />Swell factor: <br />1.125 <br />Loose volume: <br />7,875 LCY <br />Source of estimated volume: Operator Estimate; Exhibit 23, Task I, page 3 <br />Source of estimated swell Cat Handbook <br />factor <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />