My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-07_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2014-08-07_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:33 PM
Creation date
8/7/2014 9:36:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
8/7/2014
Doc Name
Adequacy Review No. 3
From
DRMS
To
Moffat County Mining
Type & Sequence
TR36
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT <br />BULLDOZER RIPPING WORK <br />Task description: Rip Rock Crusher Area <br />Site: Williams Fork Mines Permit Action: Permit Renewal 06 Permit/Job #: C1981044 <br />PROJECT IDENTIFICATION <br />Task #: 022 State: Colorado <br />Date: 6/27/2014 County: Moffat <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - lOSU <br />Ripper Attachment: 1 -Shank Ripper <br />Abbreviation: None <br />Filename: C044 -022 <br />Horsepower: 574 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $1,468.37 <br />MATERIAL QUANTITIES Selected estimating method: <br />Alternate Methods: <br />Area <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 3.67 acres Rip Depth (ft): 1.50 Volume: 8,881 <br />Source of estimated quantity: Page 2.05.4 -22R <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA feet /second <br />Area <br />Average Ripping Depth: <br />4.49 <br />mph <br />Utilization % <br />Ownership Cost/Hour: <br />$131.81 <br />Average Ripping Length: <br />NA <br />Operating Cost/Hour: <br />$184.48 <br />88.00 <br />100 <br />Ripper Operating Cost/Hour: <br />$12.79 <br />feet <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />Job Condition Correction Factors <br />NA <br />Total Unit Cost/Hour: <br />$367.09 <br />0.736 <br />Total Fleet Cost/Hour: $1,468.37 <br />MATERIAL QUANTITIES Selected estimating method: <br />Alternate Methods: <br />Area <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 3.67 acres Rip Depth (ft): 1.50 Volume: 8,881 <br />Source of estimated quantity: Page 2.05.4 -22R <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA feet /second <br />Area <br />Average Ripping Depth: <br />4.49 <br />mph <br />Average Ripping Width: <br />6.74 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.736 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.736 <br />Acres/hr <br />Site Altitude: <br />5,400 <br />feet <br />Altitude Adj : <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift /day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.61 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />2.44 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 4 Grader(s) <br />Total job time: <br />1.50 <br />Hours <br />CIRCES Cost Estimating Software <br />Page 40 of 155 <br />ICifYLTi Li KfY� <br />
The URL can be used to link to this page
Your browser does not support the video tag.