Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 39 of 155 <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Average push gradient: 0% <br />Average site altitude: <br />75 feet <br />2,105.3 LCY/hr <br />Rock, well <br />5.400 feet <br />or blasted 0.8 <br />Material weight: 2,950 lbs/LCY <br />Weight description: Traprock - broken <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />(AVG.) <br />0.800 <br />(CAT HB) <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.780 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3884 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />817.70 LCY/hr <br />3270.8 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.433/LCY <br />Total job time: 1.14 Hours <br />Total job cost: $1,618 <br />CIRCES Cost Estimating Software <br />