Laserfiche WebLink
i) Please depict and label all of the rock dust tanks on Map 25. This should include the rock <br />dust tanks in the empire village, the two at the shop area and the one said to be located in the <br />No. 5A Portal. <br />ii) Either add more detail to Map 25 or create a separate map of the Coal Handling/Storage <br />Facilities listed on proposed revised page 2.05 -9. Some items are identified on the revised <br />map and others are not. Please clearly depict and label each of the items listed. <br />iii) Please depict and label the No. 5 and 5a Mine Fresh Water System and its components (Two <br />wells, water treatment system and No. 5 Mine Water Pump) on Map 25. <br />iv) Please depict and label the Red Rock Crusher site on Map 25. <br />v) Please depict and label all of the storage yards identified as "Ancillary Facilities ". <br />vi) Please add the 100,000 gallon water tank to revised Table 56. <br />The Division is conducting a reclamation cost estimate based on the revised information. Per our <br />discussion on Monday, the Division is forwarding this letter in advance of the estimate so you can begin <br />working on a response. I will forward the updated cost estimate as soon as it is completed. <br />The decision date for TR36 is September 12, 2014. If you need additional time to address the Division's <br />concerns please request an extension of the Decision date. If you have any questions feel free to <br />contact me. (303) 866 -3567, extension 8120. <br />