Laserfiche WebLink
a. MCM Response: The specific Permit text discussion for alluvial valley floors has been <br />reviewed and updated, as appropriate, to reflect current status and conditions. Copies of <br />the revised Permit discussion accompany these responses for replacement in the PAP. <br />b. DRMS Response: <br />i. Revised section 4.24 on page 4.01 -13 discusses the operations on the Yampa <br />River Alluvial Valley Floor area. The revised wording indicates that no <br />underground mining has been done or is planned in this area. This statement is <br />inaccurate and in conflict with permit section 2.06.8 (page 2.06 -3). It appears <br />partial extraction has occurred under the Yampa River AVF of the "F" seam. <br />Also potential development is planned in this area as depicted on Map 23 and 24 <br />of both the "F" and "E" seam for the life of the mine. Please revise this <br />information. <br />H. Permit Section 2.06.8 needs to be updated to account for subsequent mining and <br />development since the first permit term. <br />c. MCM Response #2: Permit sections 2.06.8 and 4.24 have been reviewed and revised to <br />clarify historic mining under the Yampa River and associated AVF, address subsidence <br />considerations, and update the information to reflect mine development to date. The <br />revised pages are included with these responses. <br />d. DRMS Response #2: <br />i. Item 29(b)(i) is resolved. <br />ii. Item 29(b)(ii) is resolved. <br />Reclamation Cost Estimate; <br />MCM provided updates to Table 56, Map 25 and the "Mine Facilities" discussion in Section 2.05.3 of the <br />PAP to provide information to update the reclamation cost estimate for TR36 /RN6. Their response to <br />the Division's first adequacy review concerns is below. <br />a) MCM Response: Table 56, Map 25, and the "Mine Facilities" discussion in Section 2.05.3 of <br />the PAP have been reviewed, updated, and revised for consistency and to reflect the current <br />disposition and status of all major mine structures and facilities. Copies of these revised materials <br />are included with these responses. It is MCM's understanding that the Division will utilize this <br />updated information to review and revise the reclamation cost estimate, and will provide the <br />revised estimate for MCM's review. Once the updated reclamation cost estimate is finalized, a <br />copy will be inserted in Exhibit 25. If the Division incorporates the relevant historical <br />information from the current cost estimate in this update, it will replace the current cost estimate <br />in Exhibit 25, otherwise, the current cost estimate will be retained as relevant historic <br />background, and the updated cost estimate will be added to Exhibit 25. <br />b) DRMS Response: The Division has reviewed the updated Table 56, Map 25 and the "Mine <br />Facilities" discussion in Section 2.05.3 of the PAP and identified several issues that will need to <br />be addressed. Please address the items below: <br />