Laserfiche WebLink
F� �y <br /> w <br /> $ COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> ",i876 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET <br /> File No.: M- 1978-065 site Name:Seven Mile Plaza <br /> county Rio Grande TR# (DBMS Use only) <br /> Permittee: Rio Grande County <br /> Operator(If Other than Permittee): AUG 0 4014 <br /> Permittee Representative. <br /> Patrick Sullivan <br /> MININGANDC�� <br /> Please provide a brief description of the proposed revision: WE7Y <br /> To allow importation of materials including rock,gravel,topsoil,rip-rap,tree limbs,brush and other related road <br /> construction materials necessary for the maintenance and construction of roads,and the reclamation of pit slopes. All imported material shall <br /> be aned and cle.... No hazaidotismateft's shamm be allowed. Rio Grande eetinty espectfully iecluests that diisTIR apply to the followin�j <br /> mine sites: M-1978-065(Seven Mile Plaza),M-1 987-020(374 Pit),M-1978-066(10 Miles South Pit),M-1987-019(South Fork Pit). Please <br /> note that a single fee of$216 has been included to cover the TR for the four permits. <br /> 1�4 <br /> As defined by"the Minerals Rules, a Technical Revision(TR) is: "a change in Zhe%emeiit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> I IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 1 IOd, I I2d(l, 2 or 3) $1006 El <br />