My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-01_GENERAL DOCUMENTS - C1980005
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980005
>
2014-08-01_GENERAL DOCUMENTS - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:29:04 AM
Creation date
8/5/2014 9:11:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
General Documents
Doc Date
8/1/2014
Doc Name
Midterm Review & Cost Estimate, Findings
From
DRMS
To
Seneca Coal Company, LLC
Permit Index Doc Type
Findings
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: 2014 Midterm Review <br />Site: Seneca II Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: 2014 Midterm <br />Review Permit/Job #: C1980005 <br />Task #: 000 State: Colorado <br />Date: 7/2/2014 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C005 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />010 <br />015 <br />017 <br />018 <br />020 <br />025 <br />Seal GW -S41 -W and GW- S41 -LWI <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />12.00 <br />$1,800.50 <br />$114,828.00 <br />$22,680.00 <br />$7,183.00 <br />$11,929.60 <br />$5,542.00 <br />Reve etation of 266.7 acres <br />REVEGE <br />266.70 <br />Shrub/Tree Concentration Areas REVEGE <br />5.00 <br />Weed Control During Liability Period- 5% of Area REVEGE <br />Three Times <br />40.00 <br />Site Maintenance Over Liability Period SITEMAINT <br />ENANCE <br />20.00 <br />Mobilize Equip ment for Initial Reclamation <br />MOBILIZE <br />4.22 <br />SUBTOTALS: <br />347.92 <br />$163,964 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />Total = <br />$3,312.07 <br />1.05% <br />Total = <br />$1,721.62 <br />173.96 hrs <br />Total = <br />$13,074.83 <br />10.00% <br />Total = <br />$16,396.40 <br />TOTAL O & P = <br />$34,504.92 <br />CONTRACT AMOUNT (direct + O & P) = <br />$198,468.92 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />0.00 <br />4.25% <br />5.00% <br />CONTINGENCY: 0.00 <br />Total = 0.00 <br />Total = $8,434.93 <br />$9,923.45 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $52,863.30 <br />TOTAL BOND AMOUNT (direct + indirect) = $216,827.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.