Laserfiche WebLink
July 30, 2014 C- 1981- 025/North Thompson Creek Mine BFB <br />The access road to the ponds was passable. There was some standing water in the road. <br />REVEGETATION — Rule 4.15 Vegetative Cover; Timing: <br />There were some plumeless thistle plants on the refuse pile pond embankment. <br />DOCUMENTS RECEIVED: None <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />Infraction Number: CV2014001 <br />Inspection Date: April 23, 2014 <br />Date Issued: April 30, 2014 <br />Primary Topic: Hydrologic Balance <br />Secondary Topic: <br />Tertiary Topic: <br />Description: Failure to maintain discharge structure to minimize impacts to hydrological balance. <br />Abatement #: 1 <br />Abatement Due Date: 5/16/2014 <br />Abatement Due Extended Date: <br />Abatement Description: Submit a complete Technical Revision with a spillway design for Pond <br />P9 in compliance with Rules 4.05.6(4) and 4.05.9(2). <br />Abatement #: 2 <br />Abatement Due Date: 6/20/2014 <br />Abatement Due Extended Date: 7/29/2014 <br />Abatement Description: Re- construct the spillways for Pond P9 to ensure the primary and <br />emergency spillways are in compliance with the approved revision and Rules 4.05.6(4) and 4.05.9(2). <br />Abatement #: 3 <br />Abatement Due Date: 5/2/2014 <br />Abatement Due Extended Date: <br />Abatement Description: Cease discharging water through the damaged spillway. <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 3 of 4 <br />