My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-04_INSPECTION - C1981025
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981025
>
2014-08-04_INSPECTION - C1981025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:25 PM
Creation date
8/5/2014 8:53:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Inspection
Doc Date
8/4/2014
Doc Name
Inspection Report
From
DRMS
To
Minrec Inc
Inspection Date
7/30/2014
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 30, 2014 C- 1981- 025/North Thompson Creek Mine BFB <br />The access road to the ponds was passable. There was some standing water in the road. <br />REVEGETATION — Rule 4.15 Vegetative Cover; Timing: <br />There were some plumeless thistle plants on the refuse pile pond embankment. <br />DOCUMENTS RECEIVED: None <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />Infraction Number: CV2014001 <br />Inspection Date: April 23, 2014 <br />Date Issued: April 30, 2014 <br />Primary Topic: Hydrologic Balance <br />Secondary Topic: <br />Tertiary Topic: <br />Description: Failure to maintain discharge structure to minimize impacts to hydrological balance. <br />Abatement #: 1 <br />Abatement Due Date: 5/16/2014 <br />Abatement Due Extended Date: <br />Abatement Description: Submit a complete Technical Revision with a spillway design for Pond <br />P9 in compliance with Rules 4.05.6(4) and 4.05.9(2). <br />Abatement #: 2 <br />Abatement Due Date: 6/20/2014 <br />Abatement Due Extended Date: 7/29/2014 <br />Abatement Description: Re- construct the spillways for Pond P9 to ensure the primary and <br />emergency spillways are in compliance with the approved revision and Rules 4.05.6(4) and 4.05.9(2). <br />Abatement #: 3 <br />Abatement Due Date: 5/2/2014 <br />Abatement Due Extended Date: <br />Abatement Description: Cease discharging water through the damaged spillway. <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.