Laserfiche WebLink
RECLAMATION PLAN EXHIBIT E (cont) <br /> progresses . This may take one or more years depending on the <br /> economic conditions in the area and the amount of material mined. <br /> By the time mining is completed approximately 30% of the total <br /> mined land will be reclaimed. As mining ends only final back- <br /> filling, grading and shaping of the site will be needed. We <br /> expect it to take 7 to 10 years after mining ends for backfilling <br /> to be completed. Final seeding will be done by the end of the <br /> second fall after filling is completed. The area will be moni- <br /> tored for success of revegetation until accepted by the Division <br /> for release . If revegetation failures occur prior to release, an <br /> analysis of the site will be made and the area will be revege- <br /> tated again as necessary. <br /> RECLAMATION TIMETABLE <br /> ACRES ± <br /> AREA YEARS <br /> TOTAL WATER ROAD BACKFILL REVEGET UNDIS- <br /> AREA ATION TURBED <br /> Phase 1 3-5 19 .44 5 . 50 0 .11 7 . 71 10 .43 3 .40 <br /> Phase 2 7-10 33 . 73 1 0 . 00 1 0 .62 1 30 .42 1 33 . 11 1 0 . 62 <br /> Totals 53 . 17 1 5 .50 1 0. 73 1 38 . 13 1 43 . 54 1 4 . 02 <br /> 20 <br />