N <br />The Division sent SCC a review letter of the 2012 ARR on 6/26/2013, identifying an <br />error in the reported Phase 1 bond released acreage . This value needed to be corrected to <br />1,134.25 acres in accordance with SL3 approval. <br />SCC submitted a revised 2012 ARR form on 7/17/2013: <br />Total number of acres disturbed= 1,381.9 <br />Phase I Bond Released= 1, 15 1.45 acres <br />Acreage in long term mining or reclamationfacilities =177.1 acres <br />The Division approved transfer of the Tie - Across Haul Road and associated acreage from <br />the Seneca II West permit, to the Hayden Gulch Loadout Permit on 1/6/2012. The <br />Division sent SCC a second ARR review letter on 1/23/2014, identifying discrepancies in <br />the Phase I acreage values as a result of SL2, SL3, and approval of PR6. <br />SCC submitted a revised 2012 ARR form on 1/27/2014: <br />Total number of acres disturbed= 1,290.2 acres <br />Phase I Bond Released= 1, 134.25 acres <br />Acreage in long term mining or reclamation facilities =23.4 acres <br />SCC submitted a final 2012 ARR form on 3/24/2014: <br />Total number of acres disturbed= 1,290.2 <br />Phase I Bond Released= 1,343.25 acres <br />Acreage in long term mining or reclamation facilities =23.4 acres <br />SCC submitted the 2013 ARR report on 3/26/2014. <br />SCC reported the following values: <br />Total number of acres disturbed= 1,290.2 <br />Phase I Bond Released= 1, 134.25acres <br />Acreage in long term mining or reclamation facilities= 15.3 acres <br />The 2013 ARR values reflect 8.1 acres that had been in long term facilities, that were <br />reclaimed in 2013. SL4 was approved on 12/19/2013. SL4 approved Phase I bond <br />release on 127.65 acres. However, SL4 decision was not final until 1/29/2014, allowing <br />for publication of the Division's decision and a public comment period in accordance <br />with Rule 3.03.2(6). Based on the Division records, the Division is in agreement with the <br />reported values with the exception of the Phase I Bond Released acreage. <br />SL2 approved Phase I bond release of 721.90 acres. <br />SL3 approved Phase I bond release of 421.35 acres. <br />721.90 + 421.35 = 1,143.25 acres <br />2. Please correct this value in the 2013 ARR form. <br />SCC shall include the acreage approved for Phase I bond release with SL4 in the 2014 <br />ARR, since this decision was not final until January 2014. <br />of C <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303 - 866 -3567 <br />o <br />1876 <br />