Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#03A Page 2 of 2 <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFTIDAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 0.940 (CAT HB) <br /> Material Weight: 0.902 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.3800 <br /> Adjusted unit production: 80.75 LCY/hr <br /> Adjusted fleet production: 80.75 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $1.779 LCY <br /> Total job time: 15.48 Hours <br /> Total job cost: $2,223 <br /> CIRCES Cost Estimating Software <br />