My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-01_PERMIT FILE - M2013026
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013026
>
2014-08-01_PERMIT FILE - M2013026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 5:23:18 AM
Creation date
8/1/2014 1:34:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013026
IBM Index Class Name
Permit File
Doc Date
8/1/2014
Doc Name
Decision Letter
From
DRMS
To
Lockland, LLC
Email Name
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Reclamation grading <br /> Site: Hopemore Shaft Permit Action: New app Permit/Job#: M2013026 <br /> PROJECT IDENTIFICATION <br /> Task#: 03A State: Colorado Abbreviation: None <br /> Date: 7/23/2014 County: Lake Filename: M026-03a <br /> User: DMC <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D6T LGP <br /> Horsepower: 200 <br /> Blade Type: Straight <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization°o <br /> Ownership Cost/Hour: $38.47 NA <br /> Operating Cost/Hour: $67.16 100 <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $38.01 NA <br /> Total unit Cost/Hour: $143.63 <br /> Total Fleet Cost/Hour: $143.63 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 1,000 <br /> Swell factor: 1.250 <br /> Loose volume: 1,250 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 150 feet <br /> Unadjusted hourly production: 212.5 LCY hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: 0°o <br /> Average site altitude: 11,500 feet <br /> Material weight: 2,550 lbs LCY <br /> Weight description: Earth-Dry packed <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.