My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-30_PERMIT FILE - C2006085
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085
>
2014-07-30_PERMIT FILE - C2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:11 PM
Creation date
7/30/2014 9:54:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Permit File
Doc Date
7/30/2014
Doc Name
Updated Reclamation Cost Estimate (Revised)
From
DRMS
To
Angela Bellantoni -Environmental Alternative, Inc
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 81 <br />SCRAPER TEAM WORK <br /> <br />Task description: Haul Footprint of Raw Coal Stockpile to Waste Fill Pile <br /> <br />Site: Northfield Mine Permit Action: 2014 Updated Costs Permit/Job#: C2006085 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 006 State: Colorado Abbreviation: None <br />Date: 7/28/2014 County: Fremont Filename: C085-006 <br />User: JHB <br /> <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT <br /> <br />COSTShift basis: 1 per day <br /> <br /> <br />Equipment Description <br />-Scraper: Cat 623G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: <br />Scraper Work Team Support Equipment Maintenance Equipment <br />Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> <br />%Utilization-machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $75.81 NA NA NA NA NA <br />Operating cost/hour: $140.78 NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $33.56 NA NA NA NA NA <br />Unit Subtotals: $250.15 NA NA NA NA NA <br />Number of Units: 1 0 0 0 0 0 <br />Group Subtotals: Work: $250.15 Support: $0.00 Maint: $0.00 <br /> <br />$250.15 <br />Total work team cost/hour: <br /> <br />MATERIAL QUANTITIES <br /> <br />Initial volume: 600 CCY Swell factor: 1.125 <br />Loose volume: 675 LCY <br /> <br />Source of estimated volume: Map 12; Division Estimate <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> <br /> <br /> Scraper Bowl (volume) Basis: <br /> <br />Material weight: 2,350 lbs/LCY Struck Volume: 18.00 LCY <br />Material description: User Provided Heaped Volume: 23.00 LCY <br />Rated Payload: 55,200 pounds Average Volume: 20.50 LCY <br />Payload Capacity: 23.49 LCY Adjusted Capacity: 20.50 LCY <br /> <br /> <br /> <br /> <br /> <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.