My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-30_PERMIT FILE - C2006085
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085
>
2014-07-30_PERMIT FILE - C2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:11 PM
Creation date
7/30/2014 9:54:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Permit File
Doc Date
7/30/2014
Doc Name
Updated Reclamation Cost Estimate (Revised)
From
DRMS
To
Angela Bellantoni -Environmental Alternative, Inc
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 81 <br />Cycle Time: <br /> <br />Scraper Loading Time: 0.90 Minutes <br />Maneuver and Spread Time: 0.70 Minutes <br /> <br />Job Condition Correction: Site Altitude: 5400 feet <br /> <br /> Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiency: 0.830 NA (CAT HB) <br /> <br />Net Correction: 0.830 NA <br /> <br />Travel Time: <br /> Road Condition: Rutted dirt, little maintenance, no water, 1” tire penetration 4.0 <br /> <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity (fpm) Travel Time <br />(min) <br />(%) (%) (%) <br />1 700.00 2.00 4.00 6.00 1098 0.70 <br /> <br />Haul Time: 0.70 minutes <br /> <br />Return Route: <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity (fpm) Travel Time <br />(min) <br />(%) (%) (%) <br />1 700.00 -2.00 4.00 2.00 2688 0.43 <br /> <br />Return Time: 0.43 minutes <br /> <br />Total Scraper team cycle time: 2.73 minutes <br />Adjusted for job conditions: 373.96 LCY/Hour <br />Selected Number of Scrapers: 1 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 373.96 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 373.96 LCY/Hour <br /> <br />Unadjusted unit production/hour: 450.55 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Team(s) Total job time: 1.81 Hours <br /> <br />Unit cost: $0.669 /LCY Total job cost: $452 <br /> <br /> <br /> <br /> <br />CIRCES Cost Estimating Software <br />