My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-21_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2014-07-21_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:56 PM
Creation date
7/30/2014 8:30:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
7/21/2014
Doc Name
Adequacy Review
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
RN6
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> <br />SCRAPER TEAM WORK <br /> <br />Task description: Regrade D-Portal Area <br /> <br />Site: Deserado Mine Permit Action: Permit Renewal 06 Permit/Job#: C1981018 <br /> <br />PROJECT IDENTIFICATION <br /> <br /> <br />Task #:001State:ColoradoAbbreviation:None <br /> <br />Date:7/16/2014County:Rio BlancoFilename:001 <br /> <br />User:JRS <br /> <br />: <br />Agency or organization nameDRMS <br /> <br />HOURLY EQUIPMENT <br /> <br />COSTShift basis: 1 per day <br /> <br /> <br />Equipment Description <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: <br />Scraper Work Team Support Equipment Maintenance Equipment <br />Water Truck <br />Scraper Dozer Load Area Dump Area Motor Grader <br /> <br />%Utilization-machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $110.90 NA NA NA NA NA <br />Operating cost/hour: $243.12 NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $33.56 NA NA NA NA NA <br />Unit Subtotals: $387.59 NA NA NA NA NA <br />Number of Units: 6 0 0 0 0 0 <br />Group Subtotals: Work: $2,325.54 Support: $0.00 Maint: $0.00 <br /> <br />$2,325.54 <br />Total work team cost/hour: <br /> <br />MATERIAL QUANTITIES <br /> <br />Initial volume: 240,000 CCY Swell factor: 1.111 <br />Loose volume: 266,640LCY <br /> <br /> <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV Operator Study <br /> <br />HOURLY PRODUCTION <br /> <br /> <br /> Scraper Bowl (volume) Basis: <br /> <br />Material weight: 2,743 lbs/LCY Struck Volume: 24.00 LCY <br />Material description: User Provided Heaped Volume: 34.00 LCY <br />Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br />Payload Capacity: 29.75 LCY Adjusted Capacity: 29.00LCY <br /> <br /> <br /> <br /> <br /> <br /> <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.