Laserfiche WebLink
Task # 000 Page 3 of 3 <br /> <br />115 Site Maintenance During Reclamation and Ten-SITEMAINT1 400.00 $130,274.00 <br />Year Liability ENANCE <br />120 Mobilize/Demobilize Equipment for Initial MOBILIZE 1 10.00 $38,901.00 <br />Reclamation <br />121 Mobilize/Demobilize Equipment for Initial MOBILIZE 1 10.00 $6,302.00 <br />Reclamation <br />122 Mobilize/Demobilize Equipment for Pond MOBILIZE 1 10.00 $4,698.00 <br />Cleanining/Maintenanc <br /> <br />4709.64 $4,457,477 <br /> SUBTOTALS: <br /> <br /> <br />INDIRECT COSTS <br /> <br />OVERHEAD AND PROFIT: <br /> <br />Liability insurance: 2.02% Total = $90,041.04 <br />Performance bond: 1.05% Total = $46,803.51 <br />Job superintendent: 2,080.00 hrs Total = $156,332.80 <br />Profit: 10.00% Total = $445,747.70 <br /> TOTAL O & P = $738,925.05 <br /> CONTRACT AMOUNT (direct + O & P) = $5,196,402.05 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br /> <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 4.61% Total = $239,554.13 <br />Reclamation management and/or administration: 3.58% $186,031.19 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br /> <br />TOTAL INDIRECT COST = $1,164,510.38 <br /> <br /> <br />TOTAL BOND AMOUNT (direct + indirect) =$5,621,987.38 <br /> <br /> <br /> <br />CIRCES Cost Estimating Software <br />