My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-29_REVISION - C1981010 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2014-07-29_REVISION - C1981010 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:10 PM
Creation date
7/29/2014 9:24:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
7/29/2014
Doc Name
Adequacy Review No.4
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
PR7
Email Name
JLE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forrest Luke, TMI <br />Page 6 <br />7/29/2014 <br />d. Division's Response: This item is considered resolved. <br />4.08.1 Surface Water <br />23. Trapper did not submit detailed designs for post - mining drainage channels, as required by <br />Rules 2.05.3(4), 4.05.3(1), 4.05.3(1)(e), 4.053(7). <br />a. Rule 2.05.3(4)(a) — A general plan and detailed design plan shall be submitted for each <br />sediment pond, impoundment, other treatment facility and diversion proposed to be <br />constructed within the permit area. Please provide detailed design plans for each <br />postmining drainage channel. <br />b. Rule 4.05.3(1)(e) — channels must be designed, located, constructed, maintained, and <br />used to minimize adverse impacts to the hydrologic balance, and to be stable. Trapper <br />has offered details on how the channels might be constructed and maintained, but has not <br />provided specific design information. Please provide design information for each <br />postmining drainage channel to include the minimum channel dimensions and details of <br />any required velocity reduction measures. The dimensions and channel properties must <br />be based on the anticipated runoff for each specific watershed, based on watershed size, <br />topography and cover; the design precipitation event; runoff potential, etc. <br />c. Rule 4.05.3(7): <br />v. channel linings, including channel riprap, shall be designed using standard <br />engineering practices to pass safely the design velocities. Please provide design <br />information for each postmining drainage channel to include the minimum <br />channel dimensions and details of required velocity reduction. The dimensions <br />and channel properties must be based on the anticipated runoff for each specific <br />watershed, based on watershed size, topography and cover; the design <br />precipitation event; runoff potential, etc. <br />vi. Freeboard shall be no less than 0.3 feet. Please provide details on the proposed <br />channel dimensions so that the Division can determine whether the designed <br />channels maintain the required freeboard. <br />Trapper must submit the information required in Items (a) through (c) for all postmining <br />drainage channels to be constructed, completed, or reconstructed during the current <br />permit term. <br />d. Trapper's Response: Trapper is still working on a response to this comment. We have <br />encountered problems with a consultant engaged to advise us on this issue and the work <br />is still not complete. <br />e. Division's Response: This item is still outstanding and will need to be addressed prior to <br />the approval of PR7. <br />
The URL can be used to link to this page
Your browser does not support the video tag.