Laserfiche WebLink
Forrest Luke, TMI <br />Page 9 <br />7/29/2014 <br />IL Related to the item above, please specify the total disturbed acreage for the site in section 3.1.4.1 <br />of the permit. This acreage should be the total cumulative disturbed area acreage to date less the <br />area that has been Phase III bond release; plus the total proposed disturbance area for the 2013- <br />2017 permit term. This number will be the maximum about of disturbance approved for this <br />permit term. The purpose of this is to verify that Trapper has not disturbed acreage beyond what <br />they have been approved from year to year. The Division acknowledges that Trapper reports the <br />total acreage disturbed for each reporting year in the annual reclamation report. However, the <br />acreage reported in the annual reclamation report does not and should not include areas to be <br />disturbed in the future. The disturbed acreage reported in the ARR should always be less than or <br />equal to the total approved disturbed area acreage that the Division is requesting to be specified in <br />section 3.1.4.1 of the permit. <br />III. It appears based on Map M4, M10A and M10B, Trapper will be mining in the M Pit area. Please <br />add a discussion of mining in this area to section 3.1.4.1 of the permit and include the information <br />required in Rule 2.053(2). <br />If you have any questions feel free to contact me. (303) 866 -3567, extension 8120. <br />Sincerely, <br />� C <br />Jared Ebert <br />Environmental Protection Specialist <br />Enclosures: <br />].)PRO 7 Reclamation Cost Estimate Summary Sheets <br />2.) PRO Reclamation Cost Estimate Task Summary Sheets <br />3.) PRO Reclamation Cost Estimate CIRCES Sheets <br />