July 16, 2014 C- 1982 - 057 /Seneca 11-W Mine JHB <br />on this stock tank is still sparse. Vegetation needs to become better established on this stock tank. <br />Stock tank STPM3 3 was dry, both risers were disconnected. The lower discharge pipe was partially covered by <br />sediment. <br />SCC has been repairing the gullies that have formed at PM -4D and in the drainage below Culvert PM -10. At the <br />time the inspector reached the repair area, the excavator had broken down and was leaking hydraulic fluid. <br />Repairs to PM -4D had progressed. SCC had removed the damaged erosion fabric. (Photo) And will need to <br />remove the fabric from the site. The gully had been graded to allow for gentler sides. Large rock had been keyed <br />into the drainage and smaller rip -rap placed on top. SCC has re- disturbed as little additional slope as possible <br />while allowing for safe equipment access. Additional rip -rap has been placed in the drainage below Culvert PM- <br />10. Repairs are going well, but were not completed at the time of the inspection. <br />PM -11 culvert has been replaced with an 18" diameter culvert. This 18" diameter is larger than the design. The <br />culvert outlet has also been extended further downslope. <br />PM -4A and PM4 -B are fine. Additional furrows were added to the PM -413 drainage to assure runoff is directed to <br />the rip- rapped drainage. This repair is acceptable. <br />Culvert K -3 outlet still needs sediment clean out. <br />Pond 17 access road repairs are almost complete. SCC installed two French drains across the road where the <br />drainage from the slump concentrates. The southern French drain also has a 12" diameter plastic pipe to direct <br />flow through. This seep was flowing at a trickle during the inspection. SCC has a 20" diameter culvert on site to <br />replace Culvert PM -18. <br />Silt fences have been cleaned along the culvert outlets on Road J. Silt fencing has been removed and rock traps <br />have been constructed (photo) in the same configuration as the silt fencing. Sediment from these silt traps have <br />been cleaned out and removed as well. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />SCC's vegetation sampling consultant was on site and had been conducting vegetation sampling in areas <br />of the SIIW mine. The sampling crew was leaving the site as the inspector was entering the site. The inspector <br />was unable to observe the vegetation sampling efforts. The inspector spoke to the Consultant by phone to confirm <br />that sampling efforts were being conducted in accordance with the approved permit. <br />REVEGETATION — Rule 4.15 <br />Vegetative Cover; Timing: <br />Based on Canada thistle mortality along drainage PM3, earlier weed control efforts are proving effective. <br />There are still individual healthy Bull thistle plants along this drainage. <br />Number of Partial Inspection this Fiscal Year: I <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 3 of 6 <br />