Laserfiche WebLink
T. Bird, GCC Energy, LLC18Jul 2014 <br />Page 3of 3 <br />C-1981-035CMWB InspectionAdeqReview <br />coal mine waste bank has been graded, covered in accordance with 4.10.4(5), topsoil <br />has been distributed on the bank in accordance with 4.06.4, and revegetated, or at such <br />a later time as the Division may require. <br />(b)Inspections shall include such observations and tests as may be necessaryto evaluate <br />the potential hazard to human life and property, to ensure that all organic material and <br />topsoil have been removed and that proper construction and maintenance are occurring <br />in accordance with the plan submitted under 2.05.3(8) and approved by the Division. <br />(c)The engineer or other approved inspector shall consider steepness of slopes, seepage, <br />and other visible factors which could indicate potential failure, and the results of <br />failure with respect to the threat to human life and property. <br />(d)Copies of the inspection findings shall be maintained at the mine site. <br />(3)If any inspection discloses that a potential hazard exists, the Division shall be informed <br />promptly of the finding and of the emergency procedures formulated for public protection <br />and remedial action. If adequate procedures cannot be formulated or implemented, the <br />Division shall be notified immediately. The Division shall then notify theappropriate <br />emergency agencies that other emergency procedures are required to protect the public <br />from the coal mine waste area. <br />