Laserfiche WebLink
8 COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> *,t876,* 13 13 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET <br /> File No.: M- _1977'j 7a Site Name: I-ft"41Z Err57 pi7- <br /> County ?IZOW 612_5 TR# DRMS Use on hi <br /> Pennittee: �Ty ELF "Mil Z RECEIVE <br /> Operator(If Other than Permittee): JUL 15 2014 <br /> Pennittee Representative: _JZ H tJ `fz 5 u-rite721-4A)0 J� OMSION OF RECLAMATION <br /> e � <br /> u1N1NG eun eAaa*u <br /> — <br /> Please provide a brief description of the proposed revision: Ge o L,gn�itt-2 /MT�Mos To <br /> RE- Ct_t91M TttE fow&tga H)oit.1C, S►iE j15 19 -pfi L 11/7 -if Fvyz RFCiZPr?i/O� <br /> �?sH,al[, ba,9;iN�j ttT ►krn)G ilc7�LDl��F c.7ArCNi,jG 4FJQ,Wk7C.Z�ouJL <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the pen-nit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with detennining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a pen-nit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the pennittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 1 IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 1 IOd, I I2d(l, 2 or 3) S1006 ❑ <br />