My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-11_HYDROLOGY - M1977344
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977344
>
2014-07-11_HYDROLOGY - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 3:23:50 AM
Creation date
7/14/2014 8:47:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Hydrology
Doc Date
7/11/2014
Doc Name
March 2014 Groundwater Monitoring Report
From
ARCADIS
To
DRMS
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2014 Groundwater <br /> ARCADIS Monitoring Report <br /> Florence, Colorado <br /> The DRMS responded to the BBL 2004 report as part of a December 2007 site <br /> inspection. As a result of that site inspection, Holcim performed a site-wide monitoring <br /> event in March 2008. Subsequent to that monitoring event and further discussions with <br /> the DRMS, Holcim prepared a number of revisions to the GMP, as follows: <br /> • November 21, 2008 <br /> • February 17, 2009 <br /> • July 7, 2010 <br /> 1.3.2 November 21,2008 Groundwater Monitoring Plan <br /> Holcim prepared a revision to the GMP, dated November 21, 2008. The revised GMP <br /> proposed the following: <br /> • Installation of one new monitoring well (MW-13) located hydraulically downgradient <br /> of the CKD disposal area; <br /> • Annual monitoring of the new well plus existing monitoring wells MW-7 and MW- <br /> 12; and <br /> • Abandonment of monitoring wells MW-6, MW-8 and MW-10, because they were <br /> no longer usable and/or they no longer served any purpose in the monitoring <br /> program. <br /> 1.3.3 February 17,2009 Groundwater Monitoring Plan <br /> A subsequent revision to the GMP, dated February 17, 2009, proposed compliance <br /> standards for downgradient monitoring well MW-7, based upon the highest historical <br /> analyte concentrations. Those are discussed in Section 3.2. The proposed revisions to <br /> the GMP and the compliance standards were approved by the DRMS on February 24, <br /> 2009, with the condition that well MW-13 be monitored for five successive quarters to <br /> establish compliance standards for that well. A copy of the February 17, 2009 GMP <br /> from Holcim and the February 24, 2009 DRMS approval letter are included in Appendix <br /> A. The DRMS approval letter stipulated that if two or more analytical parameters in <br /> monitoring well MW-7 exceeded their respective compliance standards by more than <br /> 10%, semi-annual sampling for those parameters would be required. <br /> In April 2009, Holcim retained ARCADIS' to install one new groundwater monitoring <br /> well (MW-13) downgradient of the quarry operations, and to abandon three <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.