My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-11_HYDROLOGY - M1977344
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977344
>
2014-07-11_HYDROLOGY - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 3:23:50 AM
Creation date
7/14/2014 8:47:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Hydrology
Doc Date
7/11/2014
Doc Name
March 2014 Groundwater Monitoring Report
From
ARCADIS
To
DRMS
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2014 Groundwater <br /> ARCADIS Monitoring Report <br /> Florence, Colorado <br /> groundwater monitoring wells that were no longer active. Details of the field activities <br /> performed as part of the groundwater monitoring well installation and abandonments <br /> were documented in the Final April 2009 Groundwater Monitoring Report (ARCADIS, <br /> 2009). <br /> Following installation in April 2009, MW-13 was sampled on a quarterly basis for five <br /> consecutive quarters at the request of the DRMS for the purpose of determining the <br /> appropriate parameters and setting compliance standards for the well. Analytical <br /> results were provided in the March 2010 Groundwater Monitoring Report (ARCADIS, <br /> 2010). Subsequently, MW-13 was added to the annual groundwater monitoring <br /> program in March 2011. <br /> 1.3.4 July 7,2010 Groundwater Monitoring Plan <br /> On July 7, 2010 Holcim proposed another revision to the GMP, including proposed <br /> compliance standards for MW-13. This GMP revision can be found in Appendix B. <br /> The DRMS responded with numeric protection levels (NPLs) [previously referred to as <br /> compliance standards] for MW-13 in a letter dated November 27, 2012. This letter has <br /> been included in Appendix A. The DRMS approval letter stipulated that in addition to <br /> MW-7, if the analytical parameters exceeded their respective NPL by more than 10%, <br /> semi-annual sampling for those parameters would commence. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.