Laserfiche WebLink
Mobilization Worksheet Cont'd Task#005 Page 2 of 2 <br /> EQMMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: DURANGO <br /> Total one-way travel distance: 10.00 miles <br /> Average Travel Speed: 40.00 mph <br /> Total Non-Roadable Mob/Demob Cost <br /> `*two round trips with haul rig: $2,342.13 <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: — $7.65 <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.25 0.25 <br /> Return Time(Hours): 0.25 0.25 <br /> Loading Time(Hours): 1.00 NA <br /> Unloading Time(Hours): 1.00 NA <br /> Subtotals: 2.50 -0.50 <br /> JOB TIME AND COST <br /> Total job time: 5.00 Hours <br /> Total job cost: $2,350 <br /> CIRCES Cost Estimating Software <br />