My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-10_GENERAL DOCUMENTS - M1980146
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1980146
>
2014-07-10_GENERAL DOCUMENTS - M1980146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 3:16:53 AM
Creation date
7/11/2014 7:35:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980146
IBM Index Class Name
General Documents
Doc Date
7/10/2014
Doc Name
CIRCES Cost Estimate- No SI
From
DRMS
To
File
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: 2014 Inspection-BLM land <br /> Permit Action: 2014 Inspection- <br /> Site: Montoya Pit BLM Permit/Job#: M 1980146 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 7/1/2014 County: La Plata Filename: M146-000 <br /> User: KAP <br /> Agency or organization name: DBMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Demolish and dispose of debris DEMOLISH 1 0.00 $1,538.94 <br /> 002 1 Reduce hi hwalls to 3:1 DOZER 1 48.46 $17,173.00 <br /> 0031 Rip compacted Pit Floor RIPPER 1 50.79 $18,560.00 <br /> 004 Replace Topsoil and Subsoil(60 ac 9") DOZER 1 83.85 $29,712.00 <br /> 005 Backfill and Rough Grade DOZER 1 110.97 $39,321.00 <br /> 006 Reve etate REVEGE 1 80.00 $97,430.00 <br /> 007 Mobilize/Demobilize I MOBILIZE 1 5.00 $2,350.00 <br /> SUBTOTALS: 379.07 $206,085 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 0.00% Total= $0.00 <br /> Performance bond: 0.00% Total= $0.00 <br /> Job superintendent: 194.19 hrs Total= $14,595.32 <br /> Profit: 10.00% Total= $20,608.50 <br /> TOTAL O&P= $35,203.82 <br /> CONTRACT AMOUNT(direct+O&P)= $241,288.82 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 0.00% Total= $0.00 <br /> Reclamation management and/or administration: 5.30% $12,788.31 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $47,992.13 <br /> TOTAL BOND AMOUNT(direct+indirect)= $254,077.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.