Laserfiche WebLink
Well Installation Design Details <br />All six wells were installed in early June of 2014 and the installation details are provided by Wayne <br />Pandorf of Buckhorn Geotech, who is the Professional Engineer who supervised the well installation. <br />There were some variances in the installation from the plans submitted in TR -03 earlier in 2014. His <br />report is enclosed on the following pages: <br />Revenue Mine TR -04 Appendix 15 Page 3 <br />