Laserfiche WebLink
Page 11 of 39 <br />BULLDOZER RIPPING WORK <br />Task description: Rip 10,480 feet of internal roads <br />NA <br />feet/second <br />Site: Keenesburg Strip Mine Permit Action: MT6 <br />Permit/Job #: C1981028 <br />PROJECT IDENTIFICATION <br />Average Ripping Depth: <br />1.50 <br />mph <br />Task #: CO2 State: <br />Colorado <br />Abbreviation: <br />None <br />Date: 3/26/2014 County: <br />Weld <br />Filename: <br />CO28 -0O2 <br />User: JLE <br />Average Maneuver Time: <br />0.25 <br />feet <br />Agency or organization name: DRMS <br />0.891 <br />acres/hour <br />HOURLY EQUIPMENT COST <br />Unadjusted Hourly Unit Production: <br />Basic Machine: Cat D9T - 9SU <br />Acres/hr <br />Horsepower: <br />405 <br />Ripper Attachment: 3 -Shank Ripper <br />Altitude Adj: <br />Shift Basis: 1 <br />per day <br />Job Efficiency: <br />0.83 <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.74 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.74 <br />Utilization % <br />JOB TIME AND COST <br />Ownership Cost/Hour: <br />$78.33 <br />Fleet size: 1 Grader(s) <br />NA <br />6.49 <br />Operating Cost/Hour: <br />$146.66 <br />100 <br />Ripper Operating Cost/Hour: <br />$8.83 <br />100 <br />Operator Cost/Hour: <br />$38.85 <br />NA <br />Total Unit Cost/Hour: <br />$272.67 <br />Total Fleet Cost/Hour: <br />$272.67 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Seismic: <br />Area: <br />Alternate Methods: <br />NA Bank Volume: NA BCY NA <br />4.80 acres Rip Depth (ft): <br />Source of estimated quantity: Permit <br />HOURLY PRODUCTION <br />Seismic: <br />1.50 <br />Volume: 11,616 BCY or CCY <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />1.50 <br />mph <br />Average Ripping Width: <br />7.67 <br />degrees <br />Average Ripping Length: <br />500.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.891 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.891 <br />Acres/hr <br />Site Altitude: <br />4,000 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.74 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.74 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />6.49 <br />Hours <br />CIRCES Cost Estimating Software <br />