My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-01_PERMIT FILE - C1981028
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981028
>
2014-07-01_PERMIT FILE - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:11 PM
Creation date
7/8/2014 10:08:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Permit File
Doc Date
7/1/2014
Doc Name
Miscellaneous - Includes Reclamation Cost Estimate
Section_Exhibit Name
APPENDIX S MISCELLANEOUS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 of 39 <br />Haul Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />5280.00 <br />0.00 <br />2.00 <br />2.00 <br />2868 <br />1.986 <br />2 <br />5280.00 <br />0.00 <br />2.00 <br />2.00 <br />2868 <br />1.841 <br />3 <br />4224.00 <br />0.00 <br />2.00 <br />2.00 <br />2868 <br />1.473 <br />Haul Time: 5.300 minutes <br />Return Route- <br />JOB TI IE AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.279 /LCY <br />Total job time: 22.53 Hours <br />Total job cost: $20,752.81 <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Production <br />1 <br />4224.00 <br />0.00 <br />2.00 <br />2.00 <br />2905 <br />1.489 <br />67.37 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />5280.00 <br />0.00 <br />2.00 <br />2.00 <br />2905 <br />1.818 <br />LCY/Hour <br />3 <br />5280.00 <br />0.00 <br />2.00 <br />2.00 <br />2905 <br />1.818 <br />JOB TI IE AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.279 /LCY <br />Total job time: 22.53 Hours <br />Total job cost: $20,752.81 <br />CIRCES Cost Estimating Software <br />Return Time: 5.125 <br />minutes <br />Total Truck Cycle Time: 13.305 <br />minutes <br />Loading Tool unit <br />Production <br />545.45 LCY/Hour Adjusted for job efficiency: <br />452.73 LCY/Hour <br />Truck Unit Production <br />81.17 LCY/Hour Adjusted for job efficiency: <br />67.37 LCY/Hour <br />Optimal No. of Trucks: <br />7 Truck(s) Selected Number of Trucks: <br />6 Truck(s) <br />Adjusted hourly truck team production: 404.24 <br />LCY/Hour <br />Adjusted single truck/loader team production: 404.24 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 404.24 <br />LCY/Hour <br />JOB TI IE AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.279 /LCY <br />Total job time: 22.53 Hours <br />Total job cost: $20,752.81 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.