My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-02_REVISION - C1981035 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2014-07-02_REVISION - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:24 PM
Creation date
7/3/2014 9:37:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
7/2/2014
Doc Name
Reclamation Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
TR22
Email Name
SLB
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Mines C1981035 Technical Revision No. 22 Page 4 of 8 <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT/DAY) <br />0.600 <br />(FND -SF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2962 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />137.53 LCY/hr <br />137.53 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.656/LCY <br />Total job time: <br />Total job cost: <br />7.06 Hours <br />$637 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.