My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-03_REVISION - C1981014
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2014-07-03_REVISION - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:27 PM
Creation date
7/3/2014 7:54:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
7/3/2014
Doc Name
2nd Adequacy letter
From
DRMS
To
Energy Fuels Coal, Inc
Type & Sequence
RN6
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
George Patterson <br />Page 2 <br />July 3, 2014 <br />10. EFCI needs to establish a replacement reference area or propose acceptable reclamation <br />success standards for the loadout and update applicable text in Section 2.04.10 in the PAP. <br />Related revision TR -41 has been found incomplete; when sufficient information for the TR is <br />provided, the Division will consider this issue resolved. <br />11. No further action required for RN -06. <br />12. No further action required for RN -06. <br />13. Section 2.05.3 of the PAP still requires edits to reflect the current status of the ponds. As <br />appropriate, use language that is past tense to clarify the current situation. <br />14. No further action required for RN -06. <br />15. No further action required for RN -06 <br />16. No further action required for RN -06. <br />17. Section 2.05.6(1) of the PAP still requires edits to reflect the current status of the air permit. <br />appropriate, use language that is past tense to clarify the current situation. <br />18. Section 2.05.6(3) of the PAP still requires edits to reflect the current status of the air permit. <br />appropriate, use language that is past tense to clarify the current situation (for example, on <br />As <br />As <br />page 18 of this section the text states that there are currently three ponds at the mine site). Page <br />2.05.6 -17 needs to be updated to fit with surrounding pages. <br />19. No further action required for RN -06. <br />20. No further action required for RN -06. <br />21. No further action required for RN -06. <br />22. In the revised pages, the Corley Company Well is listed twice on pages 2.05.6 -56 and 2.05.6 -57a; <br />this is possibly an error, and one of them should possibly be listed as the Corley Mine Well. <br />The revised bullet list on page 2.05.6 -64 implies that there were six structures (rather than four) <br />assessed by RMG. Perhaps the two wells should be discussed in a separate paragraph and <br />removed from the bullet list. <br />23. EFCI has done an excellent job adding introductory text describing the current status of the <br />mine and loadout. However, these paragraphs should explain, as applicable, that some of the <br />information in the section was written many years ago and may be outdated, but it is retained <br />to document the history of the site. <br />24. No further action required for RN -06. <br />25. No further action required for RN -06. <br />If you have any questions feel free to contact me at (303) 866 -3567, extension 8113. <br />Sincerely <br />94-�' T <br />Robert Zuber, P.E. <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.