Laserfiche WebLink
. lixibit E page ? Of'? �^------ Access rd. <br /> �F <br /> 1 �< <br /> H <br /> vi Top of dam <br /> IN <br /> No overburden will be stripped due the material is <br /> silty deposited into an existing pond and is only a e ,r' .. _ 2;1 slope on the inside of dam face <br /> clean out of a pond. '' '�'` <br /> �� ' /' �' � '—to the bottom of the pond. <br /> I <br /> 6" of Top soil on average to be spread out <br /> over the area of the stockpile area andI IN <br /> tL <br /> topsoil area. Ground to be ripped or �� ,` <br /> scarified to prep before seeding. No seed o o� `` <br /> will be needed within the pond area.Any J ",`'a 3.1 slopes from the edge of the pond also known as <br /> other ground within the permit boundary I I the shore line. <br /> that was compacted or vegetation <br /> destroyed will be scarified and seeded in j,.' ;,f ,��;�` Shore line <br /> the same manner as the stockpile area, "�.N��i <br /> other than the inside of the pond. No �V� :` <br /> shrubs or trees will be planted. y ©p' a D�' Permit boundary <br /> Plan View of Lost Cause Reclamation Plan <br /> (Not to Scale) <br /> RECEIVED g2 *This map is to used in cosajtuictioxi with the <br /> Lost Cause 'Nine Plaza map showizigl sectioci Imes <br /> Jll1_ C11 ?014 and legal descriptions. <br /> DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br />