My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-31_REVISION - M1977297
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977297
>
2013-07-31_REVISION - M1977297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:25:31 PM
Creation date
7/1/2014 10:59:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977297
IBM Index Class Name
Revision
Doc Date
7/31/2013
Doc Name
TR Submittal
From
Gold Eagle Mining Inc.
To
DRMS
Type & Sequence
TR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i 4:% <br /> COLORADO DIV"ISIOIN OF RECLAMAT-ION, MINING AND SAFETY <br /> 131 Sherman Street, Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> RE MUST FOR TECHMCAL REVISION(TR) COVER S19EE,T <br /> I-Ile No.: lvl- 1977-297 Site Name: Burros Mine <br /> County. .T TR# (1)RA,43 U.se onlx) <br /> Pertnittee: G4id Eagle Mining Inc. <br /> a <br /> Operator(lf Other than permittee): On CQram <br /> Permittee Representative:- A <br /> Please provide a brief description of the proposed revision: <br /> A Technical Revision (TR) is being sought to support Final Reclamation of the Burros Mine. <br /> current conditions. <br /> As defined by the Minerals Rules,a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "riled for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process, After the TR is submitted with the appropriate tee, the Division will <br /> determine if it is approvablp within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. ifat the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the,rR unless the <br /> permittee requests additional titne, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a"I'R;however, it is up to the permittee to provide <br /> sufficient information to they Division to approve the TR request, including updated mining and <br /> reclamation plan snaps that accurately depict the changes proposed in the requested TR. <br /> Required Gees for Technical Revision by Permit Type- Please mark the correct fcc and submit it with <br /> your request for a Technical Revision. <br /> Permit Tytfe Required TR Fee Submitted (mark only one) <br /> I 1 Oc, 111, 112 construction ❑ <br /> materials,and 112 quarries I $216 <br /> 112 hard rock (not DMO) $175 ❑ <br /> 1 I Od, 112d!l, 2 or 3) i $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.