Laserfiche WebLink
Louis Head <br />Page 4 <br />June 27, 2014 <br />Rule 2.053(4) Oberation Plan — Permit Area— Coal Processinix Waste and Non -Coal Processin <br />Waste <br />8. The changes proposed under TR70 infer the intention of the NECC to transport <br />development waste from the approved temporary and permanent storage areas to the <br />RDA. A demonstration must be made that the material properties of the development <br />waste are such that when it is deposited on the existing pile either alone or when mixed <br />with processing waste, the design of the RDA will not be compromised. <br />Please provide documentation to support the deposition of development waste on the <br />RDA, and amend the permit text to describe any proposed changes to operational <br />procedure. <br />Rule 3.02.2 - Determination of Bond Amount <br />9. Exhibit 28 (Reclamation Cost Estimate) should be updated to reflect the increased <br />reclamation cost resulting from the proposed new structures. <br />Please submit a revised RCE or state that you wish the Division to update the RCE. <br />The proposed decision due date for TR70 is July 29, 2014. <br />Please feel free to contact me with any questions or comments. <br />Yours sincerely, <br />r <br />Leigh Simmons <br />Environmental Protection Specialist <br />cc. <br />Ron Thompson <br />John Terry <br />