Laserfiche WebLink
2.05.3 <br /> Bowie-2 MR-123 approved six gob vent holes to be drilled in 2011. They <br /> are GVB-B11A, B11 B, B12A, B12B, B12C & B13A. MR-124 approved two <br /> additional holes to be drilled in 2011. They are GVB-B1 1C and B1 2D. <br /> GVB-B1 2A, B1 2B, B1 2C & 1311 3A were drilled in 2012. <br /> Bowie-2 TR-73 approved ten gob vent holes and three exploration holes. <br /> They are GVB-B1 2E, GVB-B1 3B, GVB-B1 3C, GVB-B1 3D,GVB-B13E, <br /> GVB-B14A, GVB-B14B, GVB-B14C, GVB-B14D, GVB-B14E, SS-6 <br /> SS-7 and 2012-1. GVB-B12E, GVB-B13B, GVB-B13C, GVB-B13D,GVB- <br /> B13E, GVB-B14A, SS-7 and 2012-1 were drilled in 2012. The remaining <br /> holes were drilled in 2013. <br /> Bowie-2 MR-133 approved the 2012 installation of four utility holes to be <br /> installed north of the large ventilation fan above the D-Seam portals. MR- <br /> 133 also approved the 2012 installation of GVB-13F. <br /> Bowie-2 MR-134 approved the installation of an emergency vent hole into <br /> the B13 tailgate bleeder entry. Due to technical difficulties this vent hole <br /> was not installed. The drill pad for the emergency hole was constructed. <br /> Bowie-2 MR-135 approved the 2013 installation of an emergency gob vent <br /> hole for the B13 panel (GVB-B1 3C-1). <br /> Bowie-2 TR-78 approved the 2013 installation of six gob vent holes and <br /> one exploration hole. They are GVB-B1 4F, GVB-B1 5A and exploration <br /> hole SS-8. GVB-B1 5B, GVB-B1 5C, GVB-1315D, GVB-B1 6A will be drilled <br /> in 2014. <br /> Bowie-2 MR-146 approved the installation of 4,300 feet of 6 inch diameter <br /> schedule 80 HDPE pipe adjacent to the existing Pitkin Mesa pipeline. The <br /> new pipeline will be located over longwall panels B-15 and B-16. <br /> Bowie-2 TR-86 approved the 2014 installation of ten gob vent holes and <br /> three exploration holes. They are GVB-B16B, GVB-B16C, GVB-B16D, <br /> GVB-B17A, GVB-B17B, GVB-B17C, GVB-B17D, GVB-B17E, GVB-B19A, <br /> GVB-B1 9B and exploration holes 2014-SS-A, 2014-SS-B and 2014-SS-C. <br /> Bowie-2 MR-152 approved moving eleven gob vent holes. The 15, 16, 17, <br /> 18 and 19 series holes were moved. <br /> MR-152 2.05-49- 06/18/14 <br />