My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-24_GENERAL DOCUMENTS - M1987038
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1987038
>
2014-06-24_GENERAL DOCUMENTS - M1987038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 7:34:08 AM
Creation date
6/24/2014 2:20:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987038
IBM Index Class Name
General Documents
Doc Date
6/24/2014
Doc Name
CIRCES- no SI
From
DRMS
To
File
Permit Index Doc Type
General Correspondence
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilize/Demobilize <br /> Site: Baylield Pit No. 1 __ Permit Action: 2014 Inspection Permit/Job#: M1987038 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: _6/24/2014 County: La Plata _ Filename: M038-005 <br /> User: KAP <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT TRAILER <br /> (25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons_ <br /> Ownership Cost/Hour: $16.63 $18.37 $22.33 <br /> Operating Cost/Hour: $44.38 $46.13 _ $50.07 <br /> Operator Cost/Hour: $27.66 _ $27.66 $27.66 <br /> _Helper Cost/Hour: $0.00 $25.39 $25.39 <br /> Total Unit Cost/Hour: $88.67_ $117.55 $125.45 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit I Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> TONS_) I fleet <br /> i <br /> Cat D8T-8SU 47.71 $62.67 —$117.55 1 1 j $180.22 $117.55 $0.00 <br /> Drill/Broadcast 25.00 $39.59 $88.67 1 $128.26 $88.67 $0.00 <br /> Seeder with Tractor M �� <br /> Subtotals: $308.48 $206.22 $0.00 — 7 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/unit� —Fleet Size Haul Trip Return Trip <br /> _ Cost/hr/fleet Cost/hr/fleet <br /> Li ht Du Pickup,4x4,3/4 T. $15.30 1 $15.30 $15.30 <br /> Subtotals: C_ $15.30__ $15.30 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.