Laserfiche WebLink
Mobilization Worksheet Cont'd Task#005 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: _ DURANGO <br /> Total one-way travel distance: _ 25.00 miles <br /> Average Travel Speed: 45.00 mph <br /> Total Non-Roadable Mob/Demob Cost* <br /> `*two round trips with haul rig: $1,188.85 <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $17.00 <br /> Transportation Cycle Time: <br /> Non-Roadable I Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.56 0.56 <br /> Return Time(Hours): 0.56 0.56 <br /> Loading Time(Hours): 0.50 _ NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 2.11J11.11 <br /> JOB TIME AND COST <br /> Total job time: 4.22 Hours <br /> Total job cost: $1,206 <br /> CIRCES Cost Estimating Software <br />