Laserfiche WebLink
227 -25 <br />FINAL REPORT <br />GEOTECHNICAL DESIGN AND OPERATIONAL CONSIDERATIONS FOR <br />HIGHWALL MINING, SOUTH TAYLOR PIT G78 AND E/D2 SEAMS, AND <br />WEST PIT F, E, D2, AND C SEAMS <br />Submitted to <br />Mr. Juan Garcia, Technical Services Manager <br />Colowyo Coal Mine <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />July 23, 2013 <br />Prepared by <br />AGAPITo ASSOCIATES, INC. <br />1726 Cole Blvd., Bldg. 22, Suite 130 <br />Golden, CO 80401 <br />715 Horizon Drive, Suite 340 <br />Grand Junction, CO 81506 <br />