Laserfiche WebLink
Blue Pit 112 Permit Amendment <br />Table z: Mining Areas and Quantities <br />Existing Placement <br />To be Excavated <br />(Map C -1 to Map C -26) <br />To be Placed <br />(Map C -26 to Map F) <br />Excess <br />Topsoil <br />Gravel <br />Total <br />Import/ <br />East <br />Topsoil <br />Overburden <br />Acres <br />Previously <br />Topsoil <br />(@ at 1' <br />(@ at 4' <br />109,013 <br />mined <br />Stockpile <br />depth) <br />depth) <br />202,240 <br />overburden <br />47,941 <br />7,092 <br />64.57 <br />818,990 <br />105,881 <br />32,380 <br />129,518 <br />65.91 <br />106,335 <br />425,339 <br />4.20 <br />6,776 <br />27,104 <br />To be Placed <br />(Map C -26 to Map F) <br />. 134.68 818,990 105,881 145,490 581,962 9,082,266 9,809,718 2,585,724 226,178 <br />*Areal has been already been only partially mined. The disturbed area is 44.5 acres as of 2011. The topsoil and <br />overburden to be excavated is only for the unmined area. <br />The material volumes described in Table 2 are approximate but are based on the current operation <br />and exploration drilling conducted in the area. The life of the mine is estimated at 30 years after <br />2oo9 and is based on an average annual production of 450,000 tons per year. The estimated raw <br />gravel production is 9,o82,266 cubic yards or 13,623,399 tons over 30 years. This has been the <br />average over the past life of the mine but sales are always dependent on demand. <br />The East Topsoil Stockpile currently has 105,881 cubic yards of topsoil in it. The estimated <br />additional topsoil to be removed from Area 1 is 32,38o cubic yards, which is calculated at 1 foot <br />depth over the undisturbed area, which is 20.07 acres. The estimated topsoil to be removed from <br />Area 2 is 1o6,335 cubic yards, which was calculated at 1 foot depth of the entire surface area. The <br />estimated topsoil to be removed from Area 3 is 6,776 cubic yards, which was calculated at 1 foot <br />depth of the entire surface area. The total estimated topsoil to be removed is 145,490 cubic yards. <br />The total overall topsoil (to be excavated and existing topsoil stockpile) is estimated to be 251,371 <br />cubic yards. The estimated topsoil needed to put back is calculated at 1 foot over the entire surface <br />area and is 226,178 cubic yards. The difference is topsoil removed and topsoil to be placed is <br />negligible and will be averaged out over the entire site. <br />The topsoil volume was estimated using an average depth of 1 foot over the surface area. The <br />overburden volume was estimated using an average depth of 4 feet over the surface area. Area 1 <br />has already been partially mined (see Map C -1) and all volumes represent the future mining. Area <br />1 has over 1 million cubic yards of already excavated overburden and import material, which has <br />Blue Pit May 2014 D -3 <br />Topsoil <br />Gravel <br />Total <br />Backfill <br />(@ 1' <br />depth) <br />2,187,825 <br />2,349,723 <br />623,165 <br />109,013 <br />6,692,201 <br />7,223,875 <br />1,914,618 <br />110,073 <br />202,240 <br />236,120 <br />47,941 <br />7,092 <br />. 134.68 818,990 105,881 145,490 581,962 9,082,266 9,809,718 2,585,724 226,178 <br />*Areal has been already been only partially mined. The disturbed area is 44.5 acres as of 2011. The topsoil and <br />overburden to be excavated is only for the unmined area. <br />The material volumes described in Table 2 are approximate but are based on the current operation <br />and exploration drilling conducted in the area. The life of the mine is estimated at 30 years after <br />2oo9 and is based on an average annual production of 450,000 tons per year. The estimated raw <br />gravel production is 9,o82,266 cubic yards or 13,623,399 tons over 30 years. This has been the <br />average over the past life of the mine but sales are always dependent on demand. <br />The East Topsoil Stockpile currently has 105,881 cubic yards of topsoil in it. The estimated <br />additional topsoil to be removed from Area 1 is 32,38o cubic yards, which is calculated at 1 foot <br />depth over the undisturbed area, which is 20.07 acres. The estimated topsoil to be removed from <br />Area 2 is 1o6,335 cubic yards, which was calculated at 1 foot depth of the entire surface area. The <br />estimated topsoil to be removed from Area 3 is 6,776 cubic yards, which was calculated at 1 foot <br />depth of the entire surface area. The total estimated topsoil to be removed is 145,490 cubic yards. <br />The total overall topsoil (to be excavated and existing topsoil stockpile) is estimated to be 251,371 <br />cubic yards. The estimated topsoil needed to put back is calculated at 1 foot over the entire surface <br />area and is 226,178 cubic yards. The difference is topsoil removed and topsoil to be placed is <br />negligible and will be averaged out over the entire site. <br />The topsoil volume was estimated using an average depth of 1 foot over the surface area. The <br />overburden volume was estimated using an average depth of 4 feet over the surface area. Area 1 <br />has already been partially mined (see Map C -1) and all volumes represent the future mining. Area <br />1 has over 1 million cubic yards of already excavated overburden and import material, which has <br />Blue Pit May 2014 D -3 <br />