Laserfiche WebLink
General Compliance: <br />Oakridge Energy, Inc. has demonstrated compliance by completing the required abatement <br />measures found in the DRMS 2013 NOV letter. The reclamation efforts were performed in the <br />time specified by DRMS. <br />DRMS still needs to ensure that the language provided in the most current mine reclamation plan <br />(MRP) is consistent with any new reclamation that has occurred. It is also important that the <br />MRP references the most current as -built certifications and any other supporting documentation <br />as a result of the latest technical revision. <br />No disturbances to areas outside the permit area were noted. <br />Maintenance items identified during inspection: <br />• Ensure that there is positive drainage at old sediment pond so that water can connect back <br />to the Old Carbon Junction Channel. <br />• Until vegetation has adequately been established on re- graded areas, it is important to <br />utilize the appropriate BMP's to prevent any unnecessary rework in the future. <br />No compliance issues were noted and no enforcement actions were taken as a result of this <br />inspection. <br />