Laserfiche WebLink
- 000 ® - O <br /> Ellis Environmental Engineering,Inc. <br /> 4342 Ulysses Way 303-279-8532 <br /> Golden, Colorado 80403 eeeoscar@att.net <br /> May 14, 2014 <br /> Mr. Chris Hanks, Chief Environmental Coordinator <br /> Cripple Creek&Victor Gold Mining Company <br /> P.O. Box 191 <br /> Victor, Colorado 80860 <br /> RE: New Powerline—Arequa Gulch ADR Substation to the Crusher—CC&V Cresson <br /> Project,DRMS Financial Warranty Calculations <br /> Dear Mr.Hanks, <br /> Ellis Environmental Engineering, Inc. ("EEE") is pleased to provide the enclosed demolition <br /> cost estimate for the new powerline which will extend from the substation at the Arequa ADR to <br /> the Crusher Facility in support of a Technical Revision for Permit M-80-244. In compiling this <br /> warranty cost estimate several assumptions were made in the calculations—(I) demolition will <br /> be conducted by a demolition contractor, (2) actual CC&V powerline removal costs from a <br /> similar project and the 2014 Means Heavy Equipment Construction Cost Data for demolition <br /> projects apply to this project, and (3) that the DRMS is to assume responsibility for the <br /> reclamation using the posted financial warranty to accomplish the work. As such, this <br /> demolition warranty calculation includes costs for third-party equipment, labor, materials, <br /> mobilization/demobilization, contractor overhead and profit. <br /> The total financial warranty amount for this powerline project is$17,125 in 2014 dollars. <br /> I trust this calculation will fulfill the needs of DRMS and will allow CC&V to post the required <br /> financial warranty. Please contact me if you have any questions. <br /> Sincerely, <br /> . Get <br /> Michael D. Ellis, P.E. <br /> Attachments: Powerline Demolition Calculations <br />