Laserfiche WebLink
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />June 12, 2014 <br />Susan Burgmaier <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Technical Revision #84, <br />Gob Pile #3 configuration update and Pond J expansion <br />Adequacy Response #2 <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />JUN 172014 <br />Division of Reclamation, <br />Mining & Safety <br />The DRMS' letter dated March 6, 2014 requested additional information. On behalf of <br />Bowie Resources, LLC, enclosed are the requested data. <br />General Comments <br />1. DRM BRL has directed the Division to remove proposed Appendix A, to be <br />reviewed instead under Technical Revision No. 77, as we requested. Please restore <br />the approved cover material and topsoi / replacement depths on pages 4 and <br />10 of Volume XI, pending further re view of the proposed replacement depth <br />changes under TR -77. <br />BOW2: Item resolved - Pages 4 and 10 were revised and approved under TR -77. <br />Revised Application Pages <br />2. DRM : Page 2.05 -12 has been revised, as requested. The paragraph detailing Gob <br />Pile #3, however, refers to MR -139 for permitting the gob drying area. The gob drying <br />area was approved with MR -141. Please correct the minor revision reference in <br />the Gob Pile #3 summary on page 2.05 -12. <br />BOW2: Please see revised text on page 2.05 -12. <br />